Early Works & Handover
At Eifers we have a full suite of plant and equipment to manage all manner of civil works.
Because we own the machines, we do not need to hire them which enables us to react quickly to mobilise and deploy our team to carry out emergency jobs. We have the capability to manage the following type of work.
Trenching
Earthworks and Excavations
Non-Destructive Digging
Remediation works
Landscaping
Our Projects.
On behalf of Enviropacific and Melbourne Airport, Eifers completed earthworks to build 2km of the road to service Melbourne Airport’s temporary PFAS Soil Storage and stockpile area and associated Water Treatment Plant.
Eifers, on behalf of Enviropacific recently completed Stage 1 of the Soil Storage Facility at Melbourne Airport.
Eifers carried out the removal of over 10,000sq of 400mm thick aircraft pavement at East Sale RAAF Base. Works included saw cutting, demolition and material trucking.
LendLease Services engaged Eifers for the extension of the underground fuel line at Taxiway Foxtrot, Melbourne Airport.
Eifers completed the redevelopment and upgrade of the sports field at Sherbourne Public School in Melbourne's North-East.
Eifers assisted in the installation of 5 airside antennas and a containment cell (including several concrete placements) at Melbourne Airport’s SmartPath (GBAS).
Eifers was contracted to remove an unused fuel cell pipeline riser at Delta D9, Melbourne Airport in 2016. The work required saw cutting, slurry removal, lifting and disposal of the existing concrete pavement slabs, all within the operational airfield.
Eifers was contracted by Melbourne Airport to aid in relocating the Forward Command Post (FCP) to the northern end of the airfield.
Eifers was tasked with redeveloping the existing carpark area at the front reception of the Northern School of Autism, introducing a new drive-through and drop off area including a pedestrian crossing.