Our Projects

Samuel Koh Samuel Koh

MAPMP Asphalt Maintenance

Eifers in time-critical fashion, completed urgent asphalt maintenance works to Melbourne Airport's busy taxiways throughout 2019 and 2020.

Read More
Samuel Koh Samuel Koh

MAPMP Rapid Set Melbourne Airport

Antoun, in partnership with Eifers, has completed over 22 aircraft runway slabs at Melbourne Airport as part of ongoing infrastructure rectification works.

Read More
Samuel Koh Samuel Koh

Transdev Doncaster Bus Depot

Remove and replace concrete slabs within the only entrance for buses at Transdev Bus depot. The work required saw cutting, slurry removal, lifting and disposal of the existing concrete pavement slabs.

Read More
Samuel Koh Samuel Koh

Sierra Slab Replacements Melbourne Airport

Eifers removed and replaced concrete slabs on behalf of Antoun within the sierra taxiway all within 4 hours. The work required saw cutting, slurry removal, lifting and disposal of the existing concrete pavement slabs, and pouring of High-strength Rapid Set Concrete with our Volumetric trucks.

Read More
Samuel Koh Samuel Koh

Melbourne Airport Specialised Runway Repairs

Eifers was contracted to fix and prolong the life of 141 concrete runway slabs (7.6m x 7.6m) damaged by spalling, cracking and shaling that had begun to cause foreign object damage (FOD) to aircraft and other runway vehicles.

Read More
Samuel Koh Samuel Koh

Keilor Park Drive

Eifers completed time critical works on behalf of Vic Roads for Keilor Park Drive. The scope of works for this project included site Management, saw cutting, demolition and dowel drilling.

Read More
Samuel Koh Samuel Koh

Moomba, SA Big Lake Gas Facility

Remote mobilisation of multiple equipment 2000kms to Central Australia, Volumetric batching of 250m3 concrete for a compressor slab near Moomba in extreme weather conditions. Works were completed in a six-hour window.

Read More
Samuel Koh Samuel Koh

Sydney Road Emergency Pavement Repairs

Sydney Road Coburg is one of Melbourne’s busiest arterial roads leading into the city. To minimise traffic congestion and provide repairs to the damaged paving, we began with the saw cutting and demolition of existing impaired pavement and subgrade.

Read More